Project Cassandra HC-GATE

Industrial HVAC Digital Twin & Root-Cause Review • projectcassandra.uk

Advisory Alert Active • Oct 19
Demo Cooling Plant A — Chiller CH-1
ARG-BLC1 (Twin-Compressor Water-Cooled Chiller) • Aug 1, 2023 – Jan 31, 2024
Early Warning Speed
—
Loading...
Wasted Electricity
—
Loading...
Est. Avoidable Cost*
—
Loading...
Avoidable Carbon*
—
Loading...
Compressor C1 (Control)
Compressor C2 (Faulted)
Evaporator Water Flow
Telemetry & Sensor Gate

Daily Real Efficiency vs. Cassandra Hybrid AI Digital Twin

Hover any day to inspect exact expected vs. measured efficiency and daily excess electricity

AI Digital Twin Measured Real

Daily Chiller Health Calendar Matrix

Each day compares real efficiency against the AI Digital Twin • White ring = onset • Teal ring = CUSUM alert

Healthy (≥ −3%) Mild Drift High Loss Severe (< −14%)

Daily Excess Electrical Draw — Twin Compressor Split

Measured kW minus Digital Twin prediction • Faulted stage spikes while control stage tracks near 0 kW

Target Stage Excess [kW] Control Stage [kW]

Ask Cassandra

Grounded in: Demo Cooling Plant A • CH-1